dbTalk Databases Forums  

Linked cube changes

microsoft.public.sqlserver.olap microsoft.public.sqlserver.olap


Discuss Linked cube changes in the microsoft.public.sqlserver.olap forum.



Reply
 
Thread Tools Display Modes
  #1  
Old   
Amadeus Consulting
 
Posts: n/a

Default Linked cube changes - 01-13-2006 , 11:49 AM






I have a cube that contains two linked objects (cubes, including
dimension and measures) and when I make a change to the dimensions or
measures of the original cube it doesn't seem to refresh the metadata
in the cube containing the linked objects. The only way that I've been
able to get the information to update is if I delete the linked object
and then re-add it to the cube. That's fine except then I have to go
through and reconfigure all the dimensions, on the Dimension Usage tab,
as well as any other changes that I made to that cube in the combined
cube.

Example:

Cube 1: This cube has at least one dimension and one measure.

Cube 2: This cube is used for linking multiple cubes together.

Steps to reproduce:
- Link Cube 1 into Cube 2, save, deploy, process cubes...everything
works fine
- In Cube 1 add an additional measure, save, deploy, process cubes. At
this stage I usually get an error saying "Errors in the OLAP storage
engine: The metadata for the statically linked measure group, with the
name of 'XXXXX', cannot be verified against the source object."

To make this error go away I have to delete and relink Cube 1 in Cube
2. Shouldn't I be able to just refresh it?

The same problem applies with Dimensions that are linked in through the
linked cube. If I remove the dimension there is no way to re-add it with the
appropriate relationship to the cube (Regular Relationship) without deleting
and re-adding the linked cube.

--
Steve Loper
Amadeus Consulting

Reply With Quote
  #2  
Old   
Peter Yang [MSFT]
 
Posts: n/a

Default RE: Linked cube changes - 01-17-2006 , 11:43 PM






Hello Steve,

Based on my research, this behavior seems to be by design. You may want to
use DSO script to create cube2 so that it could be updated to the new
metadata.

Best Regards,

Peter Yang
MCSE2000/2003, MCSA, MCDBA
Microsoft Online Partner Support

When responding to posts, please "Reply to Group" via your newsreader so
that others may learn and benefit from your issue.

================================================== ===


This posting is provided "AS IS" with no warranties, and confers no rights.


--------------------
Quote:
Thread-Topic: Linked cube changes
thread-index: AcYYaaOvf/rwyMQXSRymwfRkMGnexQ==
X-WBNR-Posting-Host: 65.103.98.1
From: =?Utf-8?B?QW1hZGV1cyBDb25zdWx0aW5n?= <Amadeus (AT) community (DOT) nospam
Subject: Linked cube changes
Date: Fri, 13 Jan 2006 09:49:02 -0800
Lines: 35
Message-ID: <9E52C994-2AED-441B-A2DA-110A4403E635 (AT) microsoft (DOT) com
MIME-Version: 1.0
Content-Type: text/plain;
charset="Utf-8"
Content-Transfer-Encoding: 7bit
X-Newsreader: Microsoft CDO for Windows 2000
Content-Class: urn:content-classes:message
Importance: normal
Priority: normal
X-MimeOLE: Produced By Microsoft MimeOLE V6.00.3790.0
Newsgroups: microsoft.public.sqlserver.olap
NNTP-Posting-Host: TK2MSFTNGXA03.phx.gbl 10.40.2.250
Path: TK2MSFTNGXA02.phx.gbl!TK2MSFTNGP08.phx.gbl!TK2MSFT NGXA03.phx.gbl
Xref: TK2MSFTNGXA02.phx.gbl microsoft.public.sqlserver.olap:66206
X-Tomcat-NG: microsoft.public.sqlserver.olap

I have a cube that contains two linked objects (cubes, including
dimension and measures) and when I make a change to the dimensions or
measures of the original cube it doesn't seem to refresh the metadata
in the cube containing the linked objects. The only way that I've been
able to get the information to update is if I delete the linked object
and then re-add it to the cube. That's fine except then I have to go
through and reconfigure all the dimensions, on the Dimension Usage tab,
as well as any other changes that I made to that cube in the combined
cube.

Example:

Cube 1: This cube has at least one dimension and one measure.

Cube 2: This cube is used for linking multiple cubes together.

Steps to reproduce:
- Link Cube 1 into Cube 2, save, deploy, process cubes...everything
works fine
- In Cube 1 add an additional measure, save, deploy, process cubes. At
this stage I usually get an error saying "Errors in the OLAP storage
engine: The metadata for the statically linked measure group, with the
name of 'XXXXX', cannot be verified against the source object."

To make this error go away I have to delete and relink Cube 1 in Cube
2. Shouldn't I be able to just refresh it?

The same problem applies with Dimensions that are linked in through the
linked cube. If I remove the dimension there is no way to re-add it with
the
appropriate relationship to the cube (Regular Relationship) without
deleting
and re-adding the linked cube.

--
Steve Loper
Amadeus Consulting



Reply With Quote
Reply




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off



Powered by vBulletin Version 3.5.3
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.