can't drillthrough if fact table is not at leaf level... -
09-25-2006
, 04:30 PM
Hi,
I have a cube where a measure group is NOT linked to the leaf level of my
time dimension.
I'm linked to the month level and not the day level for this particular
measure group.
but the result of this design produce a drill through error when I try to
drill through...
The system says there is a security error but in fact the server refuse to
execute the drill through.
all drill against the other measure group (linked at the day level) works
fine in the cubes.
does its a normal behavior?
a bug?
any workaround? (except linked to the day level or adding another measure
group)
or anything else?
thanks.
Jerome. |