I have a cube that shows sales totals with the following
dims.
CustomerByRegion | DateTime | Engineer

how could I than tie in budgeted (hopeful) sales and
display this as a measure as well?

My (hopefulSales) table contains an ID back to the
DateTime table and an ID back to the Engineer table.

Any ideas?



Reply With Quote
  #2  
Old   
Tom Chester
 
Posts: n/a

Default Re: budgeted vs actual sales - 10-08-2003 , 03:57 PM






Here's one approach in broad strokes:

1) build a cube based on hopeful sales fact table
2) combine the 2 cubes in a virtual cube

The virtual cube will have two measures, one from each cube. For most
planning apps I'm not partial to this design because it doesn't organically
adapt (sans schema change that is) if for instance you later need track
[optimistic hopeful sales] and [pessemistic hopeful sales] separately. This
is where a version dimension, commonly named Scenario, becomes useful.

tom @ the domain below
www.tomchester.net


"Michael Morse" <mike.morse (AT) micromo (DOT) com> wrote

Quote:
I have a cube that shows sales totals with the following
dims.
CustomerByRegion | DateTime | Engineer

how could I than tie in budgeted (hopeful) sales and
display this as a measure as well?

My (hopefulSales) table contains an ID back to the
DateTime table and an ID back to the Engineer table.

Any ideas?





Reply With Quote
Reply




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off



Powered by vBulletin Version 3.5.3
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.