Hello Wellington,
A Connection is not a task in itself. A transform data task for instance
looks like two connections joined together by a black arrow. Workflow can
only be between task and task.
have a look here for a quick rundown on Workflow
http://www.sqldts.com/default.aspx?287
Allan Mitchell
www.SQLDTS.com
www.SQLIS.com
www.Konesans.com
Quote:
Hi !
I wanna control the execution process between tasks. These tasks are
between two connections.
How could i do it?
Thanks!!
Wellington Sampaio
wellington_sampaio (AT) hotmail (DOT) com |