dbTalk Databases Forums  

DTS Schedule failure

microsoft.public.sqlserver.dts microsoft.public.sqlserver.dts


Discuss DTS Schedule failure in the microsoft.public.sqlserver.dts forum.



Reply
 
Thread Tools Display Modes
  #1  
Old   
Lee Cook
 
Posts: n/a

Default DTS Schedule failure - 07-15-2003 , 02:20 AM






I have a package runing between 2 servers in different
domains, I can run it manually noproblem, if I schedule
the job it fails with error 208 in eventvwr

I assume this is a security/permissions thing, but I am
not sure why the schedule fails and the package executes.

Reply With Quote
  #2  
Old   
Jono Indrawijaya
 
Posts: n/a

Default Re: DTS Schedule failure - 07-15-2003 , 02:27 AM






Check the Log On tab of the SQLSERVERAGENT Service properties. Ensure it's
the same as when you run the package manually.

--
Hope it helps
Regards,
Jono Indrawijaya - MCDBA
PT. eBiz Cipta Solusi - Microsoft Certified Partner
Indonesia

"Lee Cook" <lee.cook (AT) om (DOT) com> wrote

Quote:
I have a package runing between 2 servers in different
domains, I can run it manually noproblem, if I schedule
the job it fails with error 208 in eventvwr

I assume this is a security/permissions thing, but I am
not sure why the schedule fails and the package executes.



Reply With Quote
Reply




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off



Powered by vBulletin Version 3.5.3
Copyright ©2000 - 2012, Jelsoft Enterprises Ltd.